Our Client

Supply, Installation and Commissioning of High Pressure Air Compressor. (200 barg)
DESCRIPTION
01 Compressor, 200 barg and 15 m3/min capacity
Lifting and Installation
Inter Skid Piping
Inter Skid Instrumentation and Electrical
Electrical Works
Cable Laying, Earthing Work
Panel Transmission, Loop Testing and Verification
Commissioning
Pre-Commissioning Checks and Verification
Commissioning, Start up and Performance Testing.
Mechanical Works
Design, Fabrication and Testing of 4500 Litres Ultra High Pressure Air Storage Vessels (250 Barg)
Structure Fabrication and Welding
Skid Structure
Interconnected Piping between Compressors and Point of Use
Equipment Erection
Compressor
Pressure Vessels with related accessories (Safety Valves, Pressure Gauges, Pressure Regulators)
Our Client

DESIGN, FABRICATION AND INSTALLATION OF CARBONATORS (CHEMICAL PROCESS SILOS)
Mechanical Works
Cutting of Top End Dish
Cutting of Existing Shell having dia of 5 meters
Fabrication and Welding of New Shell
Installation and Welding of New Dish End
Removal and Reinstallation of Heating Coils
Internal Surface Coating.
Radiographic Testing
Commissioning
Pre-Commissioning Checks and Verification
Commissioning and Performance Testing.
Our Client

DESIGN, FABRICATION AND CONSTRUCTION OF CONE SILO
DESCRIPTION
Design, Fabrication and Construction of 25 Tons Cone Silos.
Earth Works
Sand Cutting and Filling, Leveling, Grading and Compaction
Gravel Laying (Hard Capping)
Civil Works
Heavy Concrete Uplift Foundation
Our Client

DESIGN, FABRICATION AND INSTALLATION OF HIGH PRESSURE DOUBLE BOTTOM TANKS
Mechanical Works
Fabrication and Welding
Radiographic Testing
Ultrasonic Testing
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
Our Client

SUPPLY AND INSTALLATION OF 4 Nos. CARBON FILTER BAGS SEALED COMPARTMENTS
Mechanical Works
Fabrication of 280 Nos. Filter Bags Hanging Roof and Bottoms
Refurbishment of 10 Nos. Mechanical Doors
Design and Fabrication of New Walkways, including ladders
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
Our Client

REMOVAL AND LAYING OF 4 KMS. SEA WATER PIPELINE OF 500 MM DIA
Earth Works
Desiting of Intake Sea Water Channel
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
Civil Works
Excavation and Trenching
Construction of Culverts
Preparation of Bricks Support
Lowering, Back Filling and Crowning
Our Client

LAYING OF 5 KMS. FRESH WATER LINE OF 200 MM DIA
Mechanical Work
Welding
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
Civil Works
Excavation and Trenching
Preparation of Bricks Support
Lowering, Back Filling and Crowning
Our Client

REPAIRING OF MAIN KILN OF SODA ASH INCLUDING INSTALLATION OF REFRACTORY
Mechanical Work
Fabrication and Welding
Argon Arc Welding
Radiographic Testing
Ultrasonic Testing
Base Rollers Alignment
Civil Works
Fixing of Refractory Bricks
Our Client

DESIGN AND CONSTRUCTION OF 50,000 GALLONS CLARIFIER TANK INCLUDING SPILLWAY
Mechanical Work
Design, Fabrication and Installation of Walkway Bridge
Installation of Grinder Blade
Installation of Gear Box
Installation of Suction pump in the tank
Electrical Work
Cable Laying
Earthing Work
Civil Works
RCC Foundation
RCC Columns
RCC Cone Ball
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing

Our Client

DESIGN, FABRICATION and INSTALLATION OF STAINLESS STEEL CAUSTIC SODA RECOVERY PLANT STORAGE TANK OF 20,000 LTRS
Mechanical Work
Design, Fabrication and Installation of Walkway Bridge
Installation of Grinder Blade
Installation of Gear Box
Installation of Suction pump in the tank
Electrical Work
Cable Laying
Earthing Work
Civil Works
RCC Foundation
RCC Columns
RCC Cone Ball
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
Our Client

WAUKESHA 1 MW DIESEL GENERATOR OVERHAUL AT OMV KADANWARI
Mechanical Work
Dismantling of Engine
Crank Replacement
Reassembly of Engine
Electrical Work
Refurbishment of Alternator
Servicing and Refurbishment of Alternator including bearing replacement
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing

Our Client

SUPPLY AND LAYING OF 1000 RFT POLYETHYLINE PIPES
Mechanical Work
Overhauling of Suction Pump
Earth Works
Horizontal Boring for laying of Pipe under the Main road
Civil Works
Excavation
Construction of Pits
Our Client

REFURBISHMENT OF LARGE DIA SEA WATER INTAKE VALVES FOR K ELECTRIC
(2000 MM, 1800 MM, 1500 MM, 1000 MM, 500 MM)
Mechanical Work
Dismantling of Valve
Repair and Refurbishment of the Valve
Welding
Machining
Polishing
Rubberizing
Hydro Testing
Our Client

REFURBISHMENT OF HIGH PRESSURE STAINLESS STEEL VALVES FOR UEP
Mechanical Work
Dismantling of Valve
Chroming
Replacement of Seals
Hydro Testing
Our Client

SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PARKER ASPHALT PLANT
Description
Supply, Installation, Testing and
Commissioning of 3 Nos. Parker Asphalt
Plants
Commissioning
Pre Commissioning Checks and Verification
Commissioning and Performance Testing
SUPPLY AND INSTALLATION OF OVERHEAD CRANES, HOISTS AND STEEL STRUCTURES
Description
Customers – Yunus Textile Mills, International Textile Mills, K Electric, Times Ceramincs, Healthtek Pharma, Inteng Gear Automotive Ltd, Master Papers Ltd
Electrical Work
Cable Laying
Earthing Work
Mechanical Work
Design, Fabrication and Installation of Side Girders
Design, Fabrication and Installation of Rails on Side Girders
Design, Fabrication and Installation of Travelling Beams
Design, Fabrication and Installation of Gentries
MAINTENANCE OF COMPRESSORS
Description
Routine as well as Major Maintenance have been carried out on hundreds of Air Compressors as well as Process Compressors. Our teams have extensive hands on experience to work on Centrifugal, Rotary Screw, Reciprocating, Air as well as Gas Compressors. Process Blowers
Electrical Work
Motor Winding
Rotor Balancing
Bearing Replacement
Megger Testing
Dry Run Testing
Instrumentation Work
Calibration of Sensors, Pressure Transducers, Temperature Sensors
Testing of Solenoid Valve Coils
PLC Repair and Reprogramming
Mechanical Work
Dismantling and Installation of Bearing, Seals, Rotor Assembly and Diffusers on Centrifugal Compressors
Dismantling and Installation of Airend Rebuilt Kit on Rotary Screw Compressors
Dismantling and Installation of Pistons, Piston Rings, Crank Shaft Assembly, Crosshead Bushings
Refurbishment of Internal Slides and Piston
Setting of Slide Clearance
Replacement of Seals
Refurbishment of Inlet and Outlet Valves
Refurbishment of Valve Seats
Replacement of Stuffing Box
Cold Metal Spray
Machining and Polishing
Balancing of Rotors
Our Clients










SUPPLY AND LAYING OF SCHEDULE PIPES

Description
Laying of Different Sized Schedule Pipes for Compressed Air, Fire Line and Cooling Water for a diversified range of customers like K Electric BQPS 1 and BQPS 2, PAF Base Faisal, Oil and Gas Development Company Ltd, Civil Works Organization, Abbott Laboratories, Glaxo Smith Kline, Health Tek Industries, Pakistan Railways, Army Welfare Trust, PIA White Body Hangar, Zeal Pak Cement, Attock Cement, Lucky Cement and Hundreds of Textile Mills all over the country.
Civil Works
Digging of Trench for Underground Piping
Mechanical Work
Piping, Fabrication and Welding.
Structure Fabrication and Welding
Commissioning
Pre-Commissioning Checks and Verification
Commissioning, Start up and Performance Testing.